Guy and Ginger DeGarmo's ICF home
This album has been viewed 1652 times.
ICF walls in the basement with water barriers installed.
Gravel and piping for radon mitigation.
Underground plumbing is completed; visqueen installed and in-floor heat tubing installed.
A concrete floor cleans up the basement nicely.
Another view of the basement ICF walls.
Upstairs ICF complete and roof installed.
Front elevation upstairs. Completed ICF and roof framing.
Completed front elevation upstairs. Cement board siding with river rock wainscot.
Timber framed entry. (those white dots are snowflakes in the picture).
Timber framed roof over the rear deck.
Matching timber frames inside.
Cement board (Hardi Board) siding applies cleanly to the ICF walls.
Another view of the entry (entry door hidden behind visqueen).